
DaimlerChrysler?s testing facilities require regular modifications and upgrades. Permanent construction was ruled out in order to maintain flexibility of location and layout. At the same time, precise environmental and climate control was critical to ensure accuracy and consistency of test results.
DaimlerChrysler looked to Sprung Instant Structures for a solution to the limitations of a conventional structure.
After considering other options, the Sprung Structure?s erection speed, HVAC compatibility and versatility presented DaimlerChrysler with the optimal solution.
Competitive Advantage |
||
