Edge School, Calgary, Alberta - Case Study

The Edge School is a private institution with a mission to provide students from Grade 6 to 12 with a purposeful integration of excellence in academics, athletics and character-building.

Several years ago the school expanded their property and looked to traditional construction for classrooms, two NHL-sized hockey rinks and a gymnasium. When the plans were developed, the project costs exceeded their available budget by $10 million. The architect and project manager approached Sprung for an alternative proposal. After careful consideration, three 120’ wide Sprung structures were provided and erected with a net savings of $7 million. The decision to use Sprung allowed the Edge School expansion to go forward on budget and on time.

The ice arenas at the Edge School are a showcased aspect of this multi-venue development and have received high praise from visiting teams and spectators.

See our video on Sprung Performance Arenas.

“Our Sprung arenas have far exceeded our expectations in terms of look, feel and performance. The positive comments we have received on how much space there is, how bright the facility is and how good they look has been overwhelming. And most importantly folks cannot stop talking about the quality of the ice. Certainly this is a combination of ice plant and facility design however a major question in building Sprung arenas was the outside temperature and ice quality – well the questions have been answered with vigor. In 30 degree celsius weather, the ice has been outstanding!

Sprung structures are providing outstanding value for our school. They are certainly not the cheapest option nor are they the most expensive but rather a perfect middle ground. They look great both inside and out, they allow the ice surfaces to be of impeccable quality, they are so bright inside for the players and all of this was possible in such a short time frame and at such a reduced cost from a traditional bricks and mortar facility.

Initially when we set out on this project we were very focused on building facilities that would be considered the home for ‘optimal performance’. We were invested in putting in the best gymnasium flooring, the best ice plant, the best arena board system with a large amount of lighting. We were less concerned about a ‘grand aesthetic’ look but rather were looking for a less-costly covering solution. We absolutely hit a ‘home run’ with Sprung Instant Structures. Sprung structures actually enhanced our performance opportunities, look absolutely incredible both inside and outside and were erected in a fraction of the time it would have taken had we made other choices.”

Brent R. M. Devost
Founder, President & CEO
Edge School

Competitive Advantage

Home | Product | Faq | Select your application | Contact Us
© 2009 Sprung Instant Structures Ltd. © 2009 Sprung Instant Structures, Inc.
© 2009 Sprung Instant Structures, E.C.
Terms of use | Privacy Policy | ISO 9001:2000 Certification