Our durable, precision-engineered, stress membrane structures are the solution of choice for a broad range of industries needing a fast, reliable and relocatable building alternative. The Sprung structure is an innovative alternative to conventional construction utilizing architectural membrane panels placed under high tension within a non-corroding aluminum substructure.
Selected ski resort applications include
Whistler Mountain - British Columbia, Canada
"We have had a 30 ft. wide by 40 ft. long Sprung Instant Structure in place at our ski resort since 1987.
During the 1993/94 season we received approximately 326 cm. (128 inches) of snow.
The design snow load for Whistler, B.C., as per the National Building Code of Canada, is 180 pounds per square foot.
During the past five years of use, our Sprung structure has consistitently shed all snowfall off the roof of the structure and has functioned very effectively for whistler Mountain Ski Corporation as a ski camp and Olympic Station."
Back to Ski Page
Home | Product | Faq | Select your application | Contact Us © 2009 Sprung Instant Structures Ltd. © 2009 Sprung Instant Structures, Inc. © 2009 Sprung Instant Structures, E.C. Terms of use | Privacy Policy | ISO 9001:2000 Certification